Control Cable Installation - BRP E250DHLSCS Service Manual

Evinrude e-tec series 250, 300 hp 90 v6 (3.4l)
Table of Contents

Advertisement

board side of the powerhead. Secure all cables
with clamps.
After
installation,
IMPORTANT:
there is enough clearance for all cables to avoid
binding or chafing through all engine steering and
tilting angles.

Control Cable Installation

Refer to Control Cable Identification on p. 42.
Remove remote control cable trunnion covers and
cable attachment hardware.
1. Trunnion covers
Cable Retainer Clip Installation
When installing retainer clips on control arm link-
age pins, clips should be locked and must not be
bent or deformed.
For proper installation, review the following steps:
Place washer on pin.
Position retainer clip with straight section on the
bottom and angled section on the top.
Use long nose pliers to insert straight section of
clip into linkage pin hole.
003974
1. Straight section
2. Angled section
make
sure
Push the clip towards the hole while lifting on
the curved end with the pliers.
Be sure retainer clip fully engages the pin.
Lock the retainer by moving the angled section
behind the straight section.
Locked Retainer Clip
1. Angled section behind straight section
1
Shift Cable Installation and Adjustment
Place the shift cable on the shift lever pin and
install the washer and retainer clip.
IMPORTANT:
Confirm that the remote control, gearcase, shift
linkage, and shift cable are in NEUTRAL.
005037
Hold the shift linkage in NEUTRAL.
Push and pull on the shift cable and observe the
cable slack. Position the casing guide in the cen-
ter of the slack.
Adjust shift cable trunnion to align with center of
the trunnion block. Place cable trunnion in trun-
nion block.
INSTALLATION AND PREDELIVERY
OUTBOARD RIGGING
Do not bend or deform clip.
2
1
2
DP0818
DP0817
1
DP0817A
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

E250dhxscsE300dpxscsE300dcxscsE300dpzscsE300dczscs

Table of Contents