BRP E250DHLSCS Service Manual page 38

Evinrude e-tec series 250, 300 hp 90 v6 (3.4l)
Table of Contents

Advertisement

INSTALLATION AND PREDELIVERY
BOAT RIGGING
Place floor bracket on center line between end
lines. Use the inner bracket holes as guides to drill
two 5/32 in. (4 mm) pilot holes.
3 G
(11.4 L) T
ALLON
Place rods into floor bracket and secure floor
bracket with lag bolts.
1
2
1. Rods
2. Lag bolts
Place oil tank onto floor bracket. Assemble cross-
bar onto hook rods, install flat washers and lock-
nuts. Tighten locknuts to securely hold tank.
1
1. Crossbar
36
COB5381
ANK
DRC7418
1.8 G
ALLON
Place rods into floor bracket and secure floor
bracket with lag bolts.
1
2
1. Rods
2. Lag bolts
Place oil tank onto floor bracket. If cover is not
pre-assembled, route oil supply hose and harness
through the cover and position cover on the oil
tank. Attach spring-loaded rods to cover.
1
2
22241B
T
ANK
1
2
22149A
48704

Advertisement

Table of Contents
loading

This manual is also suitable for:

E250dhxscsE300dpxscsE300dcxscsE300dpzscsE300dczscs

Table of Contents