Gearcase Removal And Installation - BRP E250DHLSCS Service Manual

Evinrude e-tec series 250, 300 hp 90 v6 (3.4l)
Table of Contents

Advertisement

SHIFT INTERRUPT
SWITCH
The shift interrupt switch is in contact with the shift
lever (positioned at the base of the powerhead).
The switch is normally open and activates
momentarily as the shift linkage moves.
Excessive shift loads activate the switch. Typically
the switch is depressed when the linkage moves
from the FORWARD or REVERSE position into
the NEUTRAL position.
A depressed switch completes a ground circuit
connected to the EMM. The EMM then shuts off
fuel and spark to three cylinders for approximately
one second to reduce drivetrain loads and ease
shifting, then immediately restores normal engine
operation.
The shift interrupt switch must be released to its
normal open position before the interrupt function
can be activated again. This circuit is not func-
tional above 2500 RPM.
1
1. Switch, shift interrupt
GEARCASE REMOVAL
AND INSTALLATION
Gearcase Removal
To prevent accidental starting while ser-
vicing, twist and remove all spark plug
leads. During service, the outboard may
drop unexpectedly. Avoid personal injury;
always support the outboard's weight with
a suitable hoist or the tilt support bracket
during service.
Remove pin and washer from shift rod lever to
release the lower shift rod.
1. Shift rod screw
Note where the index mark on the gearcase aligns
with the index number of the adjustable trim tab so
the trim tab can be installed in the same position.
Remove the trim tab retaining screw, gasket and
trim tab from the gearcase.
2
005160
1
1. Index mark
2. Trim tab retaining screw
GEARCASE
SHIFT INTERRUPT SWITCH
WARNING
1
004241
13
COA3663
271

Advertisement

Table of Contents
loading

This manual is also suitable for:

E250dhxscsE300dpxscsE300dcxscsE300dpzscsE300dczscs

Table of Contents