BRP E250DHLSCS Service Manual page 240

Evinrude e-tec series 250, 300 hp 90 v6 (3.4l)
Table of Contents

Advertisement

POWERHEAD
POWERHEAD INSTALLATION
1. Rear powerhead nut
Place the shift rod in the shift rod lever. Install the
retaining pin and washer. Tighten pin to a torque
of 60 to 84 in. lbs. (7 to 9.5 N·m).
1. Shift rod pin
Make sure the gearcase shifts
IMPORTANT:
solidly into both forward and reverse and that pro-
peller shaft spins freely in neutral.
Install water hoses and exhaust back pressure
hose.
2
3
1. Cooling hose (from exhaust plenum)
2. Cooling hose (from vapor separator)
3. Speedometer hose
238
1
2
1
004252
1. Cooling hose (to exhaust plenum)
2. Exhaust back pressure hose (to EMM)
Route power trim harness through clamp and con-
nect to engine harness.
1
2
004241
1. Trim harness
2. Clamp
1
1
1. Trim/tilt connectors
Install flywheel. Refer to FLYWHEEL AND STA-
TOR SERVICING on p. 145.
004239
005042
1
006992
1
004251

Advertisement

Table of Contents
loading

This manual is also suitable for:

E250dhxscsE300dpxscsE300dcxscsE300dpzscsE300dczscs

Table of Contents