Pressure Relief Valve Servicing; Disassembly; Inspection; Assembly - BRP E250DHLSCS Service Manual

Evinrude e-tec series 250, 300 hp 90 v6 (3.4l)
Table of Contents

Advertisement

PRESSURE RELIEF
VALVE SERVICING
The pressure relief valve assembly should be ser-
viced at the same time as the thermostats.

Disassembly

Remove hose clamps and hoses from pressure
valve.
1
1. Hoses
Remove screws securing the bracket to power-
head. Remove the pressure valve housing.

PRESSURE RELIEF VALVE SERVICING

Remove the bracket and the cap from the hous-
ing. Remove the pressure valve assembly.
2
1. Bracket
1
2. Cap

Inspection

Inspect all parts for cracks, heat damage, or signs
of corrosion. Replace damaged parts. Clean
debris from housing and parts.

Assembly

Assembly is the reverse of disassembly. Pay
close attention when performing the following
004269
additional tasks.
Tighten bracket and cap screws to a torque of 60
to 84 in. lbs. (7 to 9.5 N·m).
Install valve on powerhead. Tighten nuts to a
torque of 60 to 84 in. lbs. (7 to 9.5 N·m).
Install hoses and secure with clamps.
COOLING SYSTEM
1
DRC8113
209
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

E250dhxscsE300dpxscsE300dcxscsE300dpzscsE300dczscs

Table of Contents