BRP E250DHLSCS Service Manual page 159

Evinrude e-tec series 250, 300 hp 90 v6 (3.4l)
Table of Contents

Advertisement

AMP Connectors
Always
IMPORTANT:
meter test probes and adapters when testing com-
ponents fitted with these terminals. Electrical
grease is NOT used on AMP connectors.
S
1.5
UPERSEAL
Disconnect
Lift latch. Pull connectors apart.
Connect
Confirm the seal is in place. Push connectors
together until latched.
1
1. Latch
2. Seal
Terminal Removal
Use Secondary Lock Tool, P/N 777078, to release
anti-backout device of connector housing. Next,
use Primary Lock Tool, P/N 777077, to release
locking tab of connector housing. Release locking
tab and pull on wire to remove from connector
housing.
1
1. Anti backout device, plug
2. Anti backout device, receptacle
use
the
appropriate
2
002448
2
002449
002450
ELECTRICAL AND IGNITION
CONNECTOR SERVICING
1
1. Locking tab, plug
2. Locking tab, receptacle
Terminal Installation
Align terminal with connector housing. Push con-
nector and seal into housing until seated.
1
1. Terminal and seal
Align anti-backout device with connector housing
and terminals. Use Secondary Lock Installer,
P/N 777079, to seat device in connector.
Crimping Terminals
Crimping Superseal 1.5 terminals requires the
with a specific crimping die
PRO-CRIMPER II
set.
The PRO-CRIMPER II hand tool assembly,
P/N 58583-1,
comes
P/N 58583-2.
2
1. Terminal
2. Seal
2
002447
002451
with
die
assembly
1
002452
157
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

E250dhxscsE300dpxscsE300dcxscsE300dpzscsE300dczscs

Table of Contents