FORM 161.01-PW2
ISSUE DATE: 7/18/2018
In complying with Johnson Controls' policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically
to the manual or product owner. Updated manuals, if
applicable, can be obtained by contacting the nearest
Johnson Controls Service office or accessing the John-
son Controls QuickLIT website at
johnsoncontrols.com.
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
YZ Unit Operations and Maintenance Manual
YZ Installation and Re-assembly Manual
YZ Installation Checklist and Request for Startup
YZ Startup Checklist
YZ Field Connections
YZ VSD Wiring Diagrams
YZ Field Connections and Unit Wiring
Centrifugal Chiller Long Term Storage
JOHNSON CONTROLS
CHANGEABILITY OF THIS DOCUMENT
http://cgproducts.
ASSOCIATED LITERATURE
MANUAL DESCRIPTION
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
CHANGE BARS
Revisions made to this document are indicated with a
line along the left or right hand column in the area the
revision was made. These revisions are to technical in-
formation and any other changes in spelling, grammar
or formatting are not included.
FORM NUMBER
161.01-OM1
161.01-N1
161.01-CL1
161.01-CL2
161.01-PW1
161.01-PW3
161.01-PW4
50.20-NM5
3