SYSTEM MANAGER - CONNECTION TO VICTRIX TT BOILER THROUGH EXTERNAL PROBE
INPUT.
A3
39
T
x
R /
x
G
N
D
J5
J6
input voltage:
24Vac (+10%-15%); 50/60Hz
48Vdc (36Vmin...71Vmax)
max power:8VA/6W
J1
9.8
SYSTEM MANAGER - CONNECTION TO VICTRIX EXA BOILER THROUGH EXTERNAL
PROBE INPUT.
A3
39 38
T
x
R /
x
G
N
D
J5
J6
input voltage:
24Vac (+10%-15%); 50/60Hz
48Vdc (36Vmin...71Vmax)
max power:8VA/6W
J1
38
Cable section ≥ 1 mm
T
x
R /
x
G
N
X
PWM 0/10V
J7
J8 ISOLATED
J9
J2
Cable section ≥ 1 mm
T
x
R /
x
G
N
X
PWM 0/10V
J7
J8 ISOLATED
J9
J2
7
6 5
4 3
X9
2
Key:
A13 - System manager
A3 - Boiler P.C.B.
J10
Note: - In the boiler configuration menu
A13
- Use the Boiler P.C.B. without
- Remove any jumper TA "X40" on
J3
A3
2
Key:
A13 - System manager
A3 - Boiler P.C.B.
J10
Note: - In the boiler configuration menu
A13
- Use the Boiler P.C.B. without
- Remove any jumper TA "X40" on
J3
58
5
X10
2
1
1
A3
9
X11
R2
1
set parameter "P7" "external probe
correction" = "CE".
resistance R2.
clamps 40 - 41 of the boiler board
set parameter "S7" "external probe
correction" = "CE".
resistance R2.
clamps 40 - 41 of the boiler board