Download Print this page

Immergas KIT DOMUS CONTAINER Instruction And Warning Book page 27

Advertisement

Available languages

Available languages

- Lift the door by gripping the metal-sheet plate with your right hand,
also using the front round handle and with your left hand grip the
internal handle (1a).
- Engage the tab (1c) into the provided slot (1e);
- Once the tab is inserted, lock everything in position by tightening
the 3 screws (3).
N.B.: the vertical position of the door can be adjusted using the slots
(1d).
N.B.: if the front door (1) is not aligned with the frame, a further
adjustment can be made by loosening the screws (1f) and moving the
profile (1g) vertically using the provided slots. Once adjusted, tighten
the screws (1f).
1e
1g
Fig. 10
1d
1c
1f
1f
• Make the hydraulic connection between the storage tank unit,
appliance and hydraulic unit by referring to the instruction booklet
of the installed product.
• Connect the appliance to the flue, while referring to the relevant
instruction booklet of the installed product.
N.B.: with the Domus Container it is possible to use all the condensation
boiler flue kits provided for the Solar Container with upper, front,
rear, right hand side and left hand side outlet. For the latter solution
(storage tank unit side) it will always be necessary to use a flanged
stub pipe to allow the pipes to pass over the storage tank unit itself.
N.B.: the following image is only an example of the various installation
options possible.
3
3
3
27
1a
1

Advertisement

loading

This manual is also suitable for:

3.022167