Installation Of Durulene Vibration Isolators Instructions; Fig. 57 - Installation Of Durulene Vibration Isolators Instructions - York YLAA0285SE Manual

Air-cooled scroll chillers with microchannel condenser coils style a (50 hz) 57 - 142 ton
Table of Contents

Advertisement

FORM 150.72-NM3 (1020)
ISSUE DATE 10/05/2020

INSTALLATION OF DURULENE VIBRATION ISOLATORS INSTRUCTIONS

1. Read instructions in their entirety before beginning
installation.
2. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal draw-
ings or as otherwise recommended.
3. Set isolators on floor, housekeeping pad, or sub-
base, ensuring that all isolator centerlines match the
equipment mounting holes. The VMC group rec-
ommends that the isolator base ("A") be installed on
a level surface. Shim or grout as required, leveling
D
FIG. 57 – INSTALLATION OF DURULENE VIBRATION ISOLATORS INSTRUCTIONS
JOHNSON CONTROLS
("B")
D
C L
all isolator bases to the same elevation (1/32-inch
maximum difference can be tolerated).
4. Bolt or anchor all isolators to supporting structure
utilizing base thru holes ("B").
5. Remove top bolt and top washer. Place equipment
on top of isolators so that mounting holes in equip-
ment or base line up with threaded hole ("C").
6. Reinstall top bolt and washer and tighten down.
7. Installation is complete.
("C")
C L
SECTION D-D
SECTION 5 – TECHNICAL DATA
TOP BOLT
TOP WASHER
("B")
("A")
LD13762B
129
5 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents