Chapter 4: Installing the Battery

Install the battery in accordance with the manufacturer instructions.
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
For easy access to battery connectors, it is recommended to connect the cables to
the battery and to set all battery DIP switches to their correct positions before
mounting the battery.
Measure the necessary length between the inverter and the battery for all cables.
Mark polarity on DC cables.