GE CAFE CGY366 Installation Instructions Manual page 3

36” all gas professional ranges
Table of Contents

Advertisement

Available languages

Available languages

BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT
for local inspector's use.
IMPORTANT
codes and ordinances.
IMPORTANT
material and literature from oven before connecting
gas and electrical supply to range.
IMPORTANT
the requirements of UL and CSA International and
temperatures of 194°F (90°C).
Note to Installer — Be sure to leave these
Note to Consumer —
Servicer — The electrical diagram is in an envelope
attached to the back of the range.
Proper installation is the responsibility of the
installer.
Product failure due to improper installation is not
Before installing your range on linoleum or any other
discoloring. Do not install the range over carpeting
For Café
cafeappliances.com
contact your dealer.
READ AND SAVE THESE INSTRUCTIONS
31-2000814 Rev. 1
Safety Information
— Save these instructions
— Observe all governing
— Remove all packing
— To avoid damage to
IF SOLD OUTSIDE THE U.S. AND
CANADA
WARNING
Liquefied Petroleum (LP) gas containing greater than
please call 1.888.664.8403 or 1.787.276.4051. Failure
VENT HOOD COMBINATIONS
A suitable overhead vent hood is required for models
installation to assure it meets local building codes.
comply may result in fire hazard.
combustibles.
combustibles surfaces must have an Auto-On feature.
installation instructions for specific hood clearances.
CAUTION
and to reduce the risk of personal injury or damage to
TWO PEOPLE ARE REQUIRED FOR PROPER
INSTALLATION.
Rating Label Location
Rating Label Location
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents