Storage; Unpacking; Lifting And Handling; Location And Minimum Technical Clearances - Immergas FH 25WZ Instruction And Warning Book

Table of Contents

Advertisement

4.5 Storage

Units should be stored under cover and ideally, should remain in their packaging. The tools that are supplied for opening the electrics box should be formally
transferred to the person responsible for the plant.

4.6 Unpacking

Packaging could be dangerous for the operators.
It is advisable to leave packaged units during handling and remove it before the installation.
The packaging must be removed carefully to prevent any possible damage to the machine.
The materials constituting the packaging may be different in nature (wood, cardboard, nylon, etc.).
The packaging materials should be seperated and sent for disposal or possible recycling to specialist waste companies.

4.7 Lifting and handling

When unloading the unit, it is strongly recommended that sudden movements are avoided in order to protect the refrigerant circuit, copper tubes or any
other unit component. Units can be lifted by using a forklift or, alternatively, using belts. Take care that the method of lifting does not damage the side panels
or the cover. It is important to keep the unit horizontal at all time to avoid damage to the internal components.

4.8 Location and minimum technical clearances

The unit has to be installed such that maintenance and repair is possible. The warranty does not cover costs for the provision
of lifting apparatus, platforms or other lifting systems required to perform repairs during warranty period.
The installation site should be chosen in accordance with EN 378-1 and 378-3 standards. When choosing the installation site,
all risks caused by accidental refrigerant leakage should be taken into consideration.
In the next drawing, the typical ceiling installation is shown (typical for residential buildings, offices etc.) where the unit is hanging thanks to the help of 4
brackets supplied standard. The brackets must be connected to the vibration dampers which have to be chosen according to the kind of structure they will
be fixed to. It's advisable to cover the inside of the false ceiling with high density bitume layer and to foresee one or more openings to have the possibility
to clean the air filters, to control the refrigerant circuit and to check the electrical board.
19

Advertisement

Table of Contents
loading

Table of Contents