Standard Operation Process
Document No. : Hawking FA disassembly SOP
Process Name :
Dismantle HDD
Fixture list(fixture specifications)
Ver. :
Step:
1.Dismantle HDD FFC from the
mainboard
2.Remove the HDD from C top
Qty
Fixture list(fixture specifications)
Tabulator: Ya Zhu
Station:
2018/03/12
1.00
Date
:
Department:
6(1/2)
Qty
IE