Standard Operation Process
Document No. : Hawking FA disassembly SOP
Process Name :
Dismantle Base Bottom rubber
Fixture list(fixture specifications)
Electric
screwdriver
Ver. :
Step:
1. Get rubber*2 below marked
as red
Qty
Fixture list(fixture specifications)
1
Tabulator: Ya Zhu
Station:
2018/03/12
1.00
Date
:
Department:
1(1/1)
Qty
IE