The expansion vessel must be charged
to:
1.5 bar + 0.1 bar for every metre of the
water column.
"metre of the water column" means
the vertical distance that is present
between the expansion vessel and the
solar collector.
Example:
The circulation unit is found on the
ground floor and the solar collector
is found on the roof at a hypothetical
height of 6 m, the distance to be cal-
culated is:
6 m x 0.1 bar = 0.6 bar
therefore the expansion vessel must be
charged to:
1.5 + 0.6 = 2.1 bar
Solar hydraulic unit safety valve.
There is a safety valve present on the
hydraulic unit that protects the system
from an excessive increase in pressure.
This valve intervenes by discharging
the liquid contained in the circuit when
the pressure reaches 6 bar.
If the safety valve intervenes and there-
fore part of the liquid contained in the
circuit is lost, it must be re-integrated.
13
2
1
10
11
4
8
12
49
1.32 COOLING / CENTRAL
HEATING CIRCUIT / C.H.

CIRCUIT SYSTEM FILLING.

Once hydraulically installed, proceed
with system filling via the filling cock
/ tap. Filling is performed at low speed
to ensure release of air bubbles in the
water via the Internal Unit and central
heating system vents.
The pumps can be noisy on start-up
due to the presence of air. This noise
should stop after a few minutes of
functioning and however after having
correctly bled the air contained in the
hydraulic circuit.
Make sure that the vent hoods are loos-
ened. Open the radiator vent valves.
Close radiator vent valves when only
water escapes from them.
Close the filling cock / tap when the
pack or Internal Unit manometer /
pressure gauge indicates approx. 1.2
bar.
N.B.: during these operations, enable
the automatic vent functions on the
Internal Unit (active on first ignition).
Start the pumps of the hydronic unit
by activating the kit via the relative
remote panel.
9
7
6
5
3
6
5
4
3
14
2
1
42
1.33 FILLING THE SOLAR
CIRCUIT SYSTEM

(OPTIONAL).

The system can only be filled when:
- the system is completely assembled;
- any processing residues that cause
obstructions and through time dete-
riorate the features of the glycol have
been eliminated;
- any presence of water in the system
has been eliminated, which could
otherwise cause damage to the system
in winter;
- the absence of leaks has been verified
by checks using air;
- the storage tank unit has been filled;
- the expansion vessel has been charged
according to system requirements.
The system must be filled using only
the glycol supplied by Immergas via an
automatic pump. The system must be
filled with vent valve closed.
Proceed as follows to fill the system
(Fig. 49):
1 connect the automatic pump flow
pipe to the filling cock / tap fitting
(9) positioned below the pump and
open the valve itself.
2 connect the automatic pump return
pipe to the draining cock / tap fitting
(8) and open the draining valve.
Key:
1 - Solar circulator pump
2 - Non return valve, thermometer and cock
3 - Safety valve drain fitting
4 - Flow meter
5 - 6 bar safety valve
6 - 3/4" connection for expansion vessel
7 - Pressure gauge
8 - Draining cock / tap
9 - Filling cock / tap
10 - Insulating casing
11 - Flow rate regulator
12 - Inlet
13 - Outlet
14 - Reference for flow rate reading
4
11
1
IN
12
8
9
7
2
OUT
13
6
5

Advertisement

Table of Contents
loading

Table of Contents