Download Print this page
HP mt46 Mobile Thin Client Disassembly Instructions Manual

HP mt46 Mobile Thin Client Disassembly Instructions Manual

End-of-life disassembly

Advertisement

Quick Links

Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP mt46 Mobile Thin Client
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for
the disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive
2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
NOTE: Recyclers should sort plastic materials into resin streams for recycling based on the ISO 11469 plastic marking code on
the plastic part. For any questions on plastic marking, please contact
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries, excluding Li-Ion batteries.
Li-Ion batteries. Include all Li-Ion batteries if more
than one is provided with the product (such as a
detachable notebook keyboard battery, RTC coin cell,
etc.)
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface greater
than 100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring
greater than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
weighing > 25 grams (not including PCBs or PCAs
EL-MF877-00
Template Revision C
Last revalidation date 04-01-2018
Notes
With a surface greater than 10 sq cm
M/B
All types including standard alkaline, coin or button
style batteries
Battery(ies) are attached to the product by (check all
that apply with an "x" inside the "[ ]"):
[X] screws
[X] snaps
[
[
NOTE: Add detailed removal procedures including
required tools in the sections 3.1/3.2.
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps (14" LED)
DC Cable for External Power Supply
Excluding B&S parts (EPS)
HPI instructions for this template are available at
HP's Sustainability
] adhesive
] other. Explain
EL-MF877-01
Contact.
Quantity of
items
included in
product
2
0
2 (Main
battery and
RTC
battery)
0
1
0
0
0
1
0
0
Page 1

Advertisement

loading

Summary of Contents for HP mt46 Mobile Thin Client

  • Page 1 Marketing Name / Model [List multiple models if applicable.] HP mt46 Mobile Thin Client Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Quantity of items Item Description Notes included in product already listed as a separate item above) Components and parts containing toner and ink, Include the cartridges, print heads, tubes, vent including liquids, semi-liquids (gel/paste) and toner chambers, and service stations. Components and waste containing asbestos Components, parts and materials containing refractory ceramic fibers...
  • Page 3 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Camellia & Linden & Lochness 14 0.10 Yi.Qiu-lin Tan.Peng-fei Prepared by...
  • Page 4 Standard Operation Procedure Document No. 1(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Release Base screws 0.10 Ver. : Edit date: Step 1. Loosen Base screw *5pcs as below picture showing. Torque 2.5 0.2 kgf.cm screw can not be slipped. Notice: Please inform production line leader or master if you found any abnormal.. Symbol Screw driver...
  • Page 5 Standard Operation Procedure 2(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Disassembly BASE 0.10 Ver. : Edit date: Step Notice: Please inform production line leader or master if you found any abnormal.. Symbol Cable jig...
  • Page 6 Standard Operation Procedure 3(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Disassembly speaker 0.10 Ver. : Edit date: Step Take away speaker Pic.1 Pic.2 Top hook Top hook Top hook Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 7 Standard Operation Procedure Document No. 4(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Disassembly battery 0.10 Ver. : Edit date: Step 1. Loosen Battery screw *4pcs as below picture showing. Torque 1.5 0.2 kgf.cm screw can not be slipped. Notice: Please inform production line leader or master if you found any abnormal.. Symbol Screw driver...
  • Page 8 Standard Operation Procedure Document No. 5(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Disassembly DDR&SSD shielding can 0.10 Ver. : Edit date: Step WWAN CARD Mylar picture 1 DDR Shielding Can Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 9 Standard Operation Procedure Document No. 6(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Ver. : Edit date: Take down DDR camera cable Step DDR Pic4 hook Pic 1 Pic 3 Pic 2 Break off the elastic arm towards two sides to pop-up DDR Pic 4 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 10 Standard Operation Procedure Document No. 7(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down DC-In Cable Ver. : Edit date: Step 1. Pull out the connector and DC-in cable Pic1 2. Loosen screw ( (Pic2) Torque Pic 1 Pic 2 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 11 Standard Operation Procedure Document No. 8(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down EDP Cable & FFC Ver. : Edit date: Step 1. Take down EDP cable(Pic1) 2. Take down K/B B/L FFC from M/B CNTR (Pic2 Pic3) Pic 1 Pic 3 Pic 2...
  • Page 12 Standard Operation Procedure Document No. 9(1/2) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down WLAN Antenna Cable Ver. : Edit date: Step 1. Take down WLAN Antenna Cable Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 13 Standard Operation Procedure Document No. 9(2/2) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down WLAN Antenna Cable Ver. : Edit date: Step 1. Take down WLAN Antenna Cable Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 14 Standard Operation Procedure 10 1/1 Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Ver. : Edit date: Take down hinge screw from C part Step Loosen Torque 3.0 0.2 kgf.cm screw can not be slipped. Pic1 Pic2 Notice: Please inform production line leader or master if you found any abnormal.. Symbol Screw driver...
  • Page 15 Standard Operation Procedure 11 1/1 Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down SSD/WLAN/WWAN card Ver. : Edit date: Step 1. Take down screw *3 (Pic1) Torque 1.5 0.2 kgf.cm screw can not be slipped. Pic1 Notice: Please inform production line leader or master if you found any abnormal.. Symbol Screw driver...
  • Page 16 Standard Operation Procedure Document No. 12(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take Click pad/Smart card/KB FFC Ver. : Edit date: Step 1. Take down Click pad FFC (Pic1) 2. Take down Smart Card FFC (Pic2 3. Take down K/B FFC Pic3 Pic1 Pic3 Pic2...
  • Page 17 Standard Operation Procedure Document No. 13(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down FR/NFC FFC and battery Ver. : Edit date: Step 1. Take down Finger print FFC Pic1) 2. Take down NFC FFC (Pic2) 3. Take down small battery (Pic3) Pic1 Pic2 Pic3...
  • Page 18 Standard Operation Procedure Document No. 14(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down NFC Ver. : Edit date: 1. Take down NFC Module antenna parts Pic1 Step 2. Take down NFC Module PCB parts Pic2 CNTR can not pull drag NFC antenna can not pull drag Pic1 Pic2...
  • Page 19 Standard Operation Procedure Document No. 15(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down FAN screw Ver. : Edit date: Step FAN Screw (SET) * 3 Pic1 screw can not be slipped Torque FAN connector pic1 Pic1 Notice: Please inform production line leader or master if you found any abnormal.. Symbol Screw driver...
  • Page 20 Standard Operation Procedure Document No. 16(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down USB Cable/FFC Ver. : Edit date: Step 14 UMA DIS not have this station 1. Take down USB/B FFC Pic2 2. Take down USB wire cable (Pic3) Pic1 Pic1 Pic2...
  • Page 21 Standard Operation Procedure 17(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down USB/B & Bracket Ver. : Edit date: Step 1. Take down M2.0 x 4.0L (6052B0081901) * 3 (Pic1) Torque 1.5 0.2 kgf.cm screw can not be slipped 2.Take down BRK 14 UMA Pic1...
  • Page 22 Standard Operation Procedure 18(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down M/B screw Ver. : Edit date: Step 1. 14” DIS take down M/B Screw M2x2L *3 yellow frame and screw M2x4L *2 red frame Pic1/Pic2 screw can not be slipped Torque 1.5 0.2 kgf.cm...
  • Page 23 Standard Operation Procedure Document No. 19(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down Thermal screw Ver. : Edit date: Step 14P/14W UMA Pic1 Pic2 Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 24 Standard Operation Procedure 20(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down Frame and screw Ver. : Edit date: Step 1. Take down Frame and screw M2x4L * 4 (Pic1) screw can not be slipped 2. Take down Frame Pic1 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 25 Standard Operation Procedure 21(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down M/B Ver. : Edit date: Step Pic 1 14P/14W UMA 14W DIS 14W DIS Pic2 Pic3 Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 26 Standard Operation Procedure 22(1/2) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take Finger Print or Dummy Finger Ver. : Edit date: Step 1.Take down screw M2.0 * L1.5 (Pic1/ Pic2) screw can not be slipped Torque 0.2kgf Cm 2.
  • Page 27 Standard Operation Procedure Document No. 22(2/2) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down Smart card/B or Dummy Ver. : Edit date: Step For Smartcard/B 1.Take down M2x2L screw * 3 (Pic1) screw can not be slipped For Smartcard Dummy 1.
  • Page 28 Standard Operation Procedure Document No. 23(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down FFC and aluminum foil Ver. : Edit date: Step 1.Take down FFC Pic1 For 14W DIS SKU 1.Take down aluminum foil Pic2 Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 29 Standard Operation Procedure Document No. 24(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down click pad and pick button Ver. : Edit date: Step 1. Take down Pick button screw * 4 screw can not be slipped 2. Take down Click pad screw * 5 screw can not be slipped Notice: Please inform production line leader or master if you found any abnormal..
  • Page 30 Standard Operation Procedure 25(1/2) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Disassembly bezel 0.10 Ver. : Edit date: Step 1. Hair dryer need to be around 10cm from B-cover. 2. When blowing, need to swing and moving along bezel together. Not focus on single spot to keep blowing.
  • Page 31 Standard Operation Procedure 25(2/2) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Disassembly Bezel-2 0.10 Ver. : Edit date: Step 1. After heating the bezel 25s by 60 C, then use the thickness jig to separate bezel and panel, disassembly priority as below showing 1~2~3~4, Attention: First, separate bezel adhesive, and then release bezel hook.
  • Page 32 Standard Operation Procedure 26(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Hinge cap 0.10 Ver. : Edit date: Step 1. Loosen hinge cap screw and disassembly hinge cap from unit. Torque 1.0 0.2 kgf.cm screw can not be slipped. Push toward right side Notice: Please inform production line leader or master if you found any abnormal..
  • Page 33 Standard Operation Procedure 27(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 panel 0.10 Ver. : Edit date: Step 1. Use tweezer to clamp left easy-pull tape, then pull down in parallel. 2. Use the same method to disassembly right easy-pull tape. Left easy-pull Right easy-pull tape...
  • Page 34 Standard Operation Procedure Document No. 28(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down e-DP Cable Ver. : Edit date: Step 1.Tear down EDP cable from panel connector. 2. Take out EDP cable from trough. 3. For Privacy panel, disassembly FFC from panel connector. Notice: Please inform production line leader or master if you found any abnormal..
  • Page 35 Standard Operation Procedure Document No. 29(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down Sponge and EMI gasket Ver. : Edit date: Step Take down all the Sponge and EMI gasket as below pictures Pic1 Support EMI gasket Support Support EMI gasket sponge...
  • Page 36 Standard Operation Procedure Document No. 30(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down Camera FPC & ALS FFC Ver. : Edit date: Step Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 37 Standard Operation Procedure Document No. 31(1/1) : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Take down ALS/B Ver. : Edit date: Step Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 38 Standard Operation Procedure 32(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Take down Camera 0.10 Ver. : Edit date: Step 1. Disassembly camera with auxiliary fixture as follow steps. 2, tear down FFC tape 1, tear down AL-Foil 3. Use jig to separate camera from A-cover left area 4,take down camera from cover...
  • Page 39 Standard Operation Procedure 33(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 Take down all the antenna 0.10 Ver. : Edit date: Step 1.Take down all the antenna Pic1 Pic2 Pic1 Pic2 Notice: Please inform production line leader or master if you found any abnormal.. Symbol...
  • Page 40 Standard Operation Procedure 34(1/1) Document No. : Camellia&Linden&Lochness14 disassembly SOP Station 2020/4/17 0.10 Ver. : Edit date: Take down hinge screw Step 1. Take down left and right screw Pic1 Pic2 Notice: Please inform production line leader or master if you found any abnormal.. Symbol Screw driver...