Maintenance - Strongway 52523 Owner's Manual

4000 lb. adjustable gantry crane
Table of Contents

Advertisement

Step 3)
Raising and lowering the Crossbeam requires two people. There is a Handle (#27) on each
of the Outer Vertical Post Assemblies. To raise the Crossbeam, press the handle and the
Inner Vertical Post will be up by one hole, insert the other Pin into this hole to hold the
position. Pull out the original pin and hook the handle to the new positioned pin. Repeat to
reach the height you need. The Inner Vertical Post Assembly has thirteen different stopping
positions.
The crane should be maintained daily, monthly, and every 12 months or after overloading.
The maintenance of the trolley and the hoist should be in accordance with relating manuals and
ANSI/ASME B30.11 and B30.16.
Only trained and qualified personnel should maintain the crane.
Clear a large enough area for maintenance, at least 1.5 Span (L) X 2.5 Height (H) of the crane's
dimensions.
Land the load if it is attached to the crane.
All controllers shall be placed in the OFF position. Place warning signs and barriers around the
maintenance area.
Disassemble the crane, inspect all parts of it, and maintain it as instructed in this manual.
Replace all roller pins used for locking. Replace all damaged, worn, bent, and lost parts, such as
warning labels.
After the maintenance work is completed and before restoring the crane to normal operation, all
replaced parts and loose materials should be removed. Reassemble the crane and conduct tests
according to this manual and ANSI/ASME B30.17.

Maintenance

⚠WARNING
Page 9 of 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents