Chapter 4: System Configuration; Setting Up Communication With The Battery And Energy Meter - SolarEdge StorEdge Interface SESTI-S4 Installation Manual

For the single phase inverter with hdwave technology and setapp configuration and lg chem batteries
Table of Contents

Advertisement

Chapter 4: System Configuration

This chapter describes how to configure your StorEdge system by setting up the
communication between the system components and setting up the required
application.
Setting up Communication with the Battery and
Energy Meter
To set up communication with the battery:
 1. Power on the system, as explained in "Connecting and Powering Systems with a DC
Disconnect Switch" on page 25.
 2. Access SetApp and select Commissioning èCommunication.
Server
LAN
RS485-1
RS485-2
ZigBee
Wi-Fi
Cellular
GPIO
Modbus
TCP port
 3. From the Communication screen, select RS485-1 è Protocol è Modbus (Multi-
Device).
 4. Return to the previous screen and select Add Modbus Device è Battery:
 5. Verify the battery information by selecting Battery 1 è Battery Information:
StorEdge Interface Installation Guide MAN-01-00621-1.1
Communication
LAN
DHCP
None
SolarEdge
Master
NA
NA
PCL 
RRCR
Disable