Purge Air Switching; Commissioning Linear Actuators; Preparing Linear Actuators For Commissioning - Siemens SIPART PS2 Series Operating Instructions Manual

Electropneumatic positioners with 4 to 20 ma/hart
Hide thumbs Also See for SIPART PS2 Series:
Table of Contents

Advertisement

7.9

Purge air switching

When the enclosure is open, the purge air switch above the pneumatic terminal strip on the
valve block can be accessed.
● In the IN position, the enclosure is flushed from inside with a small volume of clean and dry
instrument air.
● In the OUT position, the purge air is directly directed towards outside.
Figure 7-1
The factory setting is the "IN" position.
7.10

Commissioning linear actuators

7.10.1

Preparing linear actuators for commissioning

Condition
You have already installed the positioner using the suitable mounting kit.
Setting the transmission ratio selector
Note
Commissioning
The setting of the transmission ratio selector is extremely important to commission the
positioner.
SIPART PS2 with 4 to 20 mA/HART
Operating Instructions, 11/2019, A5E00074631-AE
Purging air selector
Pneumatic connections Y1, PZ and Y2
Purge air switch on the valve block; view of the positioner on the pneumatic connection
side when the cover is open
Stroke [mm]
5 to 20
25 to 35
40 to 130
7.10 Commissioning linear actuators
Position of the transmission ratio selector
33°
90°
90°
Commissioning
117