Download Print this page

GE C2S995SEL Training Bulletin page 4

Front control

Advertisement

11. Transfer the sensor circuit board from the defective blower to the replacement blower.
Connect the sensor circuit board and connect wire terminals to motor tabs. Carefully
work blower assembly into place and attach to duct by replacing the hex-head screws
in the order indicated in the photo above.
12. Power up unit. Check for blower operation as per Step 2. DISCONNECT POWER.
13. Replace:
•Hex-head screws in side panel and the Phillips screws in rear splash guard
•Motor spill guard
•Maintop
•Vent trim
•RJ45 connector to square hole of rear wire cover
•Backguard complement strip and rear wire cover
•Rear spacer-to-wall trim
•Top burners and grates.
•Power unit and check for cooling blower operation one more time per Step 2. Start a self-
clean cycle and listen for rattles with fan operating at high speed, then cancel self-clean
operation.
If holes aren't aligning easily,
consider leaving out the two screws
indicated. Driving these screws
under tension may deform ducting
and cause blower to bind.
4

Advertisement

loading

This manual is also suitable for:

Pgs960eelPgs960belPgs960felPgs960selCgs995selCgs995eel