Download Print this page

GE C2S995SEL Training Bulletin page 2

Front control

Advertisement

4. Check for foreign objects in the blower wheel. The wheel should rotate freely by hand
without noise or undue friction. Be sure nothing is pressing against the red hub on the
end opposite the motor. Re-route any wires, such as the RJ45 connector leads, that may
lie in contact with the motor shaft.
5. Visually check wire connections to the low speed (black wire) and high speed (red wire)
tabs of the blower motor. Check connection to the Neutral (white wire) tab. Make sure the
gray plastic six-pin connector is fully engaged.
6. Power up range. Check for blower operation again using Test Mode (Step 2). If blower
now operates, look for insulation pushing up on blower that would cause binding when fully
assembled.
Ensure that proper clearance
between wires and blower
assembly will be maintained
when rear wire cover is re-
installed.
Remove the three hex screws
securing blower and lift blower
and duct assembly. Push
insulation beyond vertical
flange of oven cavity.
2
continued...

Advertisement

loading

This manual is also suitable for:

Pgs960eelPgs960belPgs960felPgs960selCgs995selCgs995eel