Bottle filler tubular fountain with sanitary freeze resistant dual valve control assembly (11 pages)
Summary of Contents for Elkay 4400FR
Page 1
97243C Single Valve Control Assembly INSTALLER 4400FR Fountains are among the easiest to install Fountains on the market today. To assure you install these models easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL, AND OTHER APPLICABLE CODES.
4400FR_FTN LK4400FR_FTN INSTALLATION INSTRUCTIONS IMPORTANT THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER.
Page 3
4400FR_FTN LK4400FR_FTN SITE PREPARATION DETAIL FOR THE 4400FR FTN. WHEN USING 97243C SINGLE VALVE CONTROL ASSY. PVC COLUMN CENTERED BETWEEN MOUNTING (6)1/2" (13mm) DIA. HOLES BOLT HOLES EQUALLY SPACED ON A 12" (305mm) BOLT CENTER O 14" 356mm FIG. 1 O 10"...
4400FR_FTN LK4400FR_FTN TROUBLE SHOOTING AND MAINTENANCE Insufficient Bubbler Flow: Check that the shut-off valve is wide open. Verify minimum 20 PSI supply pressure. Clean inlet strainer screen located in the valve body. Clean rubber orifice in flow control located below frost line in bushing between barb fitting and valve. No Flow: Check for leaks in the air tubing going from the push button to the valve. Make sure the air tubing compression nut is hand tight. Disconnect air tube from push button. Place finger over air outlet. Push button to test diaphragm. Tighten diaphragm cap screws. Replace diaphragm if necessary.
Page 5
4400FR_FTN LK4400FR_FTN Single Valve Assy. (Item *28) 30, 30a, 30b The following items are included with the 4400FR Fountain PARTS LIST ITEM PART NO. DESCRIPTION 100147140560 Drain Gasket 75589C Gasket 101449542550 Clamp - Hose 101570540560 Drain Gasket 45790C Flow Control Fitting...
Page 6
4400FR_FTN LK4400FR_FTN Owners Manual 4400 Freeze Resistant Tubular Fountain with SanitaryFR1 Valve INSTALLATION INSTRUCTIONS IMPORTANT! INSTALLER PLEASE NOTE Tubing must be cut to the right length. Do not coil any excess tubing or it will cause valve to malfunction. General Installation Tips 1. Prepare trench for water supply and waste drain lines. The hole should be deep enough to accommodate the PVC column. Additional porous fill and drain pipe may be required due to local ground conditions. Cut the PVC column to fit desired bury depth. Set PVC column in excavating pit.
Page 7
4400FR_FTN LK4400FR_FTN SUGGESTED SITE PREPARATION DETAIL FOR THE 4400FR FTN. WHEN USING THE SANITARYFR1 VALVE 4" PVC 1/4 BEND 1-1/2" DRAIN TUBE (SUPPLIED BY INSTALLER) (SUPPLIED BY INSTALLER) 4" PVC PIPE (SUPPLIED BY INSTALLER) CONCRETE SLAB CLEANOUT PLUG FOR ACCESS 4"...
Page 8
4400FR_FTN LK4400FR_FTN SUGGESTED SITE PREPARATION DETAIL FOR THE 4400FR FTN. WHEN USING THE SANITARYFR1 VALVE (6) 1/2" (13mm) DIA. HOLES EQUALLY SPACED ON A 1-1/4 DRAIN TUBE 12" ( 305mm ) BOLT CENTER SUPPLIED WITH FTN. AIR GAP ASSY. 14"...
Page 9
4400FR_FTN LK4400FR_FTN FOUNTAIN CONNECTIONS PLUMBING CONDUIT (BY INSTALLER) TO VALVE FIG. 3 INSTRUCTIONS FOR CONNECTING TUBES FROM VALVE TO FOUNTAIN Step 1 - Insert the 1/8” O.D. tube (Label A) into the connector (provided with fountain). Insert the 1/8” O.D. tube coming from the fountain push button actuator into the connector.
Page 10
4400FR_FTN LK4400FR_FTN Stream Height Adjustment 3, 11 See Detail B FIG. 5 FIG. 4 Detail B 97731C (Rev. L - 12/15) PAGE 10...
4400FR_FTN LK4400FR_FTN The Following Items are included with the SanitaryFR1 Valve PARTS LIST DESCRIPTION ITEM NO. PART NO. 110175443890 Hex Nut - 3/8-16 45806C Single Valve 50986C Regulator Holder 56082C Regulator Nut 56092C Poly Tubing - 1/4” (Cut To Length) - To Bubbler 56123C Poly Tubing - 1/8”...
Page 12
4400FR_FTN LK4400FR_FTN TROUBLE SHOOTING AND MAINTENANCE Insufficient Bubbler Flow: Check that the shut-off valve is wide open. Verify minimum 20 PSI supply pressure. Clean inlet strainer screen located in the valve body. Clean rubber orifice in flow control located below frost line in bushing between barb fitting and valve. No Flow: Check for leaks in the air tubing going from the push button to the valve. Make sure the air tubing compression nut is hand tight. Disconnect air tube from push button. Place finger over air outlet. Push button to test diaphragm. Tighten diaphragm cap screws. Replace diaphragm if necessary.
Page 13
97247C Kit - VR Torx Screw/Bit 28703C Blank Nameplate Insert (only) 28703C-LK LK4400FR Nameplate Insert (only) 28091C-HT 4400FR Nameplate Insert (only) 5565C Fitting - Double Male Connector 56092C Poly Tubing - 1/4" (Cut To Length) - To Bubbler Included with 56123C Poly Tubing - 1/8"...