SolarEdge StorEdge Installation Manual page 52

Single phase inverter with hd-wave technology and setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Designer
Designer recommends inverter and power optimizer selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/.
Mapper Application
Use the Mapper smart phone application to scan the power optimizer
and inverter 2D bar-codes and create a virtual map of a PV site for
enhanced monitoring and easier maintenance.
The Mapper
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the power optimizer serial number to the correct model in
the system physical layout.
For detailed information, refer to the Mapper demo movies:
Creating new sites using the Mapper mobile application
Mapping existing sites using the Mapper mobile application
 
Physical Layout Editor
 1. If you are a registered installer, access the monitoring platform site
creation page at
web/p/home#createSites. If you have not yet signed up, go to
https://monitoring.solaredge.com/solaredge-
web/p/createSelfNewInstaller.
 2. Fill out all required information in the screen, which includes
information about your installation, as well as details about its logical
and physical mapping.
StorEdge Single Phase Inverter with HD-Wave Technology MAN-01-00627-1.1
Chapter 6: Activating, Commissioning and Configuring the System
https://monitoring.solaredge.com/solaredge-
    51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents