Reporting And Monitoring Installation Data - SolarEdge StorEdge Installation Manual

Single phase inverter with hd-wave technology and setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Meter Status
Production Meter
   RS485-2
Modbus ID #2
Power
7.60 kW
 
Type and function: Displays the meter functionality (Production, Export, Import,
Export+Import).
Status: Displays OK if the meter is communicating with the inverter.
<Error message>: If there is a meter error, it is displayed in this line.
Power: Depending on the meter type connected to the inverter, this line displays
the exported or imported power.
Energy: The total energy read by the meter. The value displayed in this line depends
on the meter type connected to the inverter and its location:
If a bidirectional meter is connected at the consumption point, this value is the
consumed energy.
If the meter is installed at the production connection point, this value is the
energy produced by the site.
If the meter is installed at the grid connection point, this value is the energy
exported to the grid.
NOTE
This data is accumulated according to an internal real-time clock.

Reporting and Monitoring Installation Data

NOTE
Monitoring the site requires connecting the inverter to the monitoring
platform, using any of the wired or wireless options available from SolarEdge.
Refer to Setting Up Communication to the Monitoring Platform on page 53.
StorEdge Single Phase Inverter with HD-Wave Technology MAN-01-00627-1.1
Chapter 6: Activating, Commissioning and Configuring the System
Meters
 
SN: XXXXXXXX
Status
OK
Energy
13.68MWh
    49