BRP Evinrude E-Tec Series Installation Manual page 70

Hide thumbs Also See for Evinrude E-Tec Series:
Table of Contents

Advertisement

OUTBOARD RIGGING
EVINRUDE E-TEC MODELS 40–90 HP
I-Command Network Connections
If the outbo ard will be used with I-Command, or
other NMEA 2000 compliant CANbus instruments,
use the following connections to su pply informa-
tion to the network:
Remove lower motor covers. Remove air silencer.
Route I-Command Engine Interface Cable around
the front of the throttle body, following the path of
the TPS wiring, and behind the batte ry cable.
Loosely install tie straps as shown.
NOTICE
To prevent wire chafing, harness
must be routed below the flywheel cover.
1
2
2 Cylinder Models
1. Flywheel cover
2. Harness routing
3. Tie straps
1
2
3 Cylinder Models
1. Flywheel cover
2. Harness routing
3. Tie straps
68
Connect the I-Command Engine Inte rface Cable
to the EMM CANbus connector.
1
1. I-Command network connector
2. EMM CANbus connector
2 C
YLINDER
To prevent interference with engine cover latch,
bundle excess wiring b ehind EMM cooling water
hose. Secure I-Command connectors to back side
of engine harness with tie strap.
3
1
2
006736
1. Engine harness
2. EMM cooling water hose
3
2
006742
M
ODELS
2
006735
2
006738

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents