Lifting The Outboard - BRP Evinrude E-Tec Series Installation Manual

Hide thumbs Also See for Evinrude E-Tec Series:
Table of Contents

Advertisement

OUTBOARD INSTALLATION

LIFTING THE OUTBOARD

LIFTING THE
OUTBOARD
Lifting Fixtures
A
WARNING
To avoid personal injury, make sure the lift-
ing capacity of the hoist is at least twice
the weight of the outboard.
DO NOT allow the lift hook or chain from
the hoist to come in contact with any part
of the engine during lifting.
Remove shipping carton.
Use correct Lifting Fixture to lift outboard:
Model
90° V6
60° V4–V6
40–90 HP
90° V6 M
ODELS
Position lifting tool on flywheel and seat the three
screws completely.
1
1. Lifting fixture
2. 1 3/4 in. screws
Fasten appropriate chain hoo k to eye of too l.
Carefully hoist outboard with chain and unbolt out-
board mounting brackets from frame.
44
Lifting Fixture
P/N 396748 with
1 3/4 in. screws
P/N 342672
P/N 396748 with
1 1/8 in. screws
2
002419
60° V4
V6 M
AND
ODELS
Position lif ting to ol o n cra nkshaft and tig hten th e
center ret aining screw securely using a 1/4 in.
Allen wrench.
1. Center retaining screw
Fasten a ppropriate chain hook to
Carefully hoist outboard with chain and unbolt out-
board mounting brackets from frame.
40–90 HP M
ODELS
With re coil st arter re moved, place lifting too l on
flywheel and sea t the three screws completely.
Refer to RECOIL STARTER REMOVAL in the
correct Service Manual.
1
1. Lifting fixture
2. 1 1/8 in. screws
NOTICE
Use only the 1 1/8 in. (short)
screws, P/N 398067, included with the tool to
avoid damage to electronic components under
the flywheel.
Fasten a ppropriate chain hook to
Carefully hoist outboard with chain and unbolt out-
board mounting brackets from frame.
1
004945
eye of tool.
2
002098
eye of tool.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents