BRP Evinrude E-TEC Series Service Manual page 290

Hide thumbs Also See for Evinrude E-TEC Series:
Table of Contents

Advertisement

MANUAL STARTER
RECOIL STARTER ASSEMBLY
Route rope through the rope guide and into the
pulley rope channel.
1
1. Rope guide
2. Rope channel
Tie a knot in the end of the rope as shown.
Pulley Knot Detail
Use an appropriate tool to place the knot in the
channel.
Pull rope taut and remove stop tool. Allow rope to
slowly wind into starter.
288
Remove left-hand threaded nut and retainer from
tool base. Remove starter assembly.
2
007723
1. Left-hand threaded nut
2. Retainer
Install spindle, screw and lock nut. Tighten nut to a
torque of 124 to 141 in. lbs. (14 to 16 N·m).
0.375 in.
9.5 mm
007724
1. Lock nut
Install pawl, linkage and retaining ring.
1
007725
1. Retaining ring
007726
1
2
007727
1
007711
007710

Advertisement

Table of Contents
loading

Table of Contents