BRP Evinrude E-TEC Series Service Manual page 251

Hide thumbs Also See for Evinrude E-TEC Series:
Table of Contents

Advertisement

Slide the gearcase into place, making sure that:
Driveshaft engages the crankshaft
Water tube enters grommet on water pump
Upper shift rod enters the shift rod connector.
Apply Gasket Sealing Compound to threads of the
gearcase retaining screws. Install and tighten the
screws to a torque of 128 to 146 in. lbs. (14.5 to
16.5 N·m).
1
1. Gearcase retaining screws
For 25 inch models, apply Triple-Guard grease to
threads of the studs. Install washers and gearcase
retaining nuts. Tighten nuts to a torque of 128 to
146 in. lbs. (14.5 to 16.5 N·m).
1
1. Gearcase retaining nuts
Align the groove in the upper shift rod with the
screw hole in the connector. Apply Gasket Sealing
Compound to threads of the shift rod connector
GEARCASE REMOVAL AND INSTALLATION
screw. Tighten screw, with washer, to a torque of
60 to 84 in. lbs. (7 to 9.5 N·m).
Install the port and starboard water intake screens
with water intake holes positioned at the rear of
gearcase. Tighten screws to a torque of 10 to 14
in. lbs. (1.1 to 1.6 N·m).
007653
1. Water intake screen
WARNING
To prevent loss of operator control, check
for proper shifting operation and adjust, if
necessary.
008371
IMPORTANT:
sembled gearcase, change the gearcase lubricant
between 10 to 20 hours of operation.
GEARCASE
During break-in period of a reas-
007654
1
007649
12
249

Advertisement

Table of Contents
loading

Table of Contents