Final Adjustments - BRP Evinrude E-TEC Series Service Manual

Hide thumbs Also See for Evinrude E-TEC Series:
Table of Contents

Advertisement

POWERHEAD
POWERHEAD INSTALLATION
STEP 3: Secure shift lever to shift lever detent.
Remove one shift lever screw. Clean screw and
apply Nut Lock to threads.
Reinstall the shift lever screw.
Hold shift lever on midpoint line and tighten
screw to a torque of 80 to 106 in. lbs. (9 to 12
N·m).
Remove remaining shift lever screw. Clean
screw and apply Nut Lock to threads. Reinstall
and tighten screw to a torque of 80 to 106 in.
lbs. (9 to 12 N·m).
1. Shift lever
2. Shift lever screws
Adjust neutral switch. Refer to Neutral Switch
Adjustment on p. 25.
190

Final Adjustments

NOTICE
After installing a new or rebuilt
powerhead, perform the following procedures
before returning outboard to service:
Index all spark plugs. Refer to Spark Plug
Indexing on p. 36.
Use Evinrude Diagnostics software to start pow-
erhead break-in oiling. Refer to Powerhead
Break-In on p. 62.
Use Evinrude Diagnostics software to make
sure engine management software version and
1
revision are current. Update as required.
Use Evinrude Diagnostics software to confirm
neutral switch operation. Refer to Neutral
Switch Adjustment on p. 25.
Prime fuel system.
Prime oiling system. Refer to Oil Supply Prim-
ing on p. 150.
Use Evinrude Diagnostics software to check
2
engine timing. Refer to TIMING ADJUST-
MENTS on p. 106.
008463
Run outboard and check for water, fuel, or oil
leaks.
Make sure engine reaches correct operating
temperature and does not overheat.

Advertisement

Table of Contents
loading

Table of Contents