Buss Cable, Hoses, And Wire Routing And Connections - BRP Evinrude E-TEC G2 150 HP Installation & Predelivery Manual

Table of Contents

Advertisement

Outboard Rigging

Buss Cable, Hoses, and Wire Routing and Connections

Buss Cable, Hoses, and
Wire Routing and
Connections
NOTICE
After installation, make sure there is enough
clearance for all cables to avoid binding or
chafing through all engine steering and tilting
angles.
All hydraulic steering hoses, battery cables, buss
cables, fuel and oil hoses and related rigging
enter the rigging center through a cable entryway.
1
1. Rigging center cable entry
Hose and cable lengths are measured from the
cable entryway to the connection point in the rig-
ging center. Refer to 74° V6 Models Hose and
Cable Lengths (Full Featured Midsection) on
the next page.
62
Route all steering hoses, battery cables, fuel and
oil hoses, buss cables, and optional accessories
such as auxiliary battery charging cable, or
remote oil tank hose from the boat through a pro-
tective conduit into the rigging center cable entry.
When installing hoses and cables through the
flexible tubing, install in this order:
1. steering hoses
2. battery cables
3. fuel hose
4. optional oil or flush hoses
5. buss cables
6. optional accessory connections
009117

Advertisement

Table of Contents
loading

Table of Contents