Rigging Center Access; Shipping Brackets - BRP Evinrude E-TEC G2 150 HP Installation & Predelivery Manual

Table of Contents

Advertisement

Outboard Rigging

Rigging Center Access

Rigging Center Access
Evinrude E-TEC G2 models utilize a central rig-
ging center. All buss cables, hydraulic steering,
fuel and oil hoses and other rigging enter the rig-
ging center through a cable entryway.
Remove four screws from the cable entry cover.
Remove the cover.
1. Four screws
2. Cable entry cover
The cable entryway is set up for starboard cable
entry but can be adapted for port cable entry.
Rotate the rigging hose retainer 90° and pull to
remove. Carefully squeeze the end cap at the tab
locations and pull to remove. Reinstall the retainer
and end cap into the desired locations.
1
90°
1. Rigging hose retainer
2. End cap tab
60
1
2
009106
2
009117-3

Shipping Brackets

Remove the shipping brackets from the steering
arm and stern bracket.
IMPORTANT:
Save the screws attaching the
shipping brackets to the steering arm. This screw
is used with the steering lock tool to bleed the hy-
draulic steering system.
1
1. Shipping brackets
1
009107

Advertisement

Table of Contents
loading

Table of Contents