  Chapter 9: Setting Up Communication to the Monitoring Platform
Chapter 9: Setting Up Communication to the
Monitoring Platform
The inverter sends the following information to the monitoring platform:
Power optimizer information received via the DC power lines (the PV output circuit).
inverter information
Information of any other connected devices.
 
This chapter describes setting up communication between:
The inverter and the monitoring platform through the Internet (wired/ wireless), or
through a cellular connection.
Multiple inverters for a master/slave configuration.
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF
switch on the StorEdge Connection Unit is turned OFF, and the AC is turned
OFF.
When configuring the communication parameters, make sure that the ON/OFF
switch on the StorEdge Connection Unit is OFF, and the AC is turned ON.
 
ATTENTION!
Lors de la connexion des câbles de communication, assurez-vous que
l'interrupteur MARCHE/ARRÊT à la base de l'onduleur soit en position ARRÊT,
et le CA est en position ARRÊT. Lors de la configuration des paramètres de
 
communication, assurez-vous que l'interrupteur MARCHE/ARRÊT soit en
position ARRÊT, et le CA est en position MARCHE.