Revision History

Version 1.5 (Feb. 2019)
Added Proposition 65 warning (for California).
Addition of appendix: External Rapid Shutdown on page 143
Power optimizer clearance - no clearance is required on the mounting bracket side
Addition of new appendix: Powering the LG Chem Battery Off and On on page 147.
Addition of reference to troubleshooting undetected devices application note
Torque for grounding using the equipment grounding bus-bar: 3.4 N*M/
30 lb-in
Update of product names
Addition of possibility to use compatible connectors from third-party
manufacturers
Recommendation to mount the power optimizer in a location protected from direct
sunlight
Updated warning about sealing unused power optimizer input connectors
Max distance between the battery and inverter is 70 ft / 20m
Removal of StorEdge Connection Unit Replacement
Addition of caution - installation in saline environment
Update regarding use of extension cables in power optimizer installation guidelines
Removal of recommendation to connect the battery and set DIP switch when the
battery is on the floor, for easier access
Addition of low battery SOE troubleshooting
Addition of important safety feature: restart behavior functionality
Addition of link to the Designer web page
Addition of battery charge/ discharge self-test and troubleshooting
Version 1.4 (Nov. 2018)
Changed the LG battery powering off sequence.