Mounting The Inverter - SolarEdge StorEdge Solution with Backup Installation Manual

Table of Contents

Advertisement

Figure 11: StorEdge Connection Unit with and without internal cover
Backed-up Loads AC Breaker: Main AC breaker for the backed-up loads. Ensure this
breaker is UP before starting up the system.
AC Bypass Switch: This switch bypasses the inverter functionality in case of inverter
malfunction. Maintaining power to the backed-up loads is enabled by connecting
the loads directly to the grid.
There are three switch positions. The following table describes the functionality and
use of each position:
Switch
Use Case
position
1 (left)
Normal
(Default)
operation
2 (right) AC bypass
0
Not in use

Mounting the Inverter

The inverter is supplied with a mounting bracket.
NOTE
Make sure the mounting surface or structure can support the weight of the
inverter and bracket, and make sure that it spans the width of the bracket.
StorEdge Solution with Backup MAN-01-00262-1.5
Normal operation.
The backed-up loads panel is connected through the
software controlled switches to the AC grid (during
normal operation), or to the inverter (via auto-
transformer, for backup power).
This mode disables the backup functionality.
The backed-up loads panel is connected directly to the
AC grid through the bypass switch. Use in case of
inverter malfunction.
Figure 12: Mounting bracket
Chapter 3: Installing the Inverter
Functionality
    35