SolarEdge StorEdge Solution with Backup Installation Manual page 23

Table of Contents

Advertisement

22
  Safety
CAUTION!
Installing a SolarEdge system without ensuring compatibility of the module
connectors with the optimizer connectors may be unsafe and could cause
functionality problems such as ground faults, resulting in inverter shut down. To
ensure mechanical compatibility of the power optimizers' connectors with the PV
modules' connectors to which they are connected:
Use identical connectors from the same manufacturer and of the same type
on both the power optimizers and on the modules; or
Verify that the connectors are compatible in the following way:
The module connector manufacturer should explicitly verify
compatibility with the SolarEdge optimizer connector; and
A third-party test report by one of the listed external labs (TUV, VDE,
Bureau Veritas UL, CSA, InterTek) should be obtained,verifying the
compatibility of the connectors.
For more information, refer to
https://www.solaredge.com/sites/default/files/optimizer-input-
connector-compatibility.pdf
 
StorEdge Solution with Backup MAN-01-00262-1.5

Advertisement

Table of Contents
loading

Table of Contents