SolarEdge StorEdge Solution with Backup Installation Manual page 122

Table of Contents

Advertisement

and the total AC output power produced (Pac):
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7
P _ O K : X X X / Y Y Y < S _ O K >
                                              O N
To test Backup:
 1. Disconnect the AC power by shutting off the AC at the main distribution panel. The
inverter should disconnect from the grid, and continue supplying power to the
backed-up loads.
Switching to Backup mode takes a few seconds. The LCD screen will show the
Backup mode is ON:
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7   3 7 1 . 9     2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
B a c k u p M o d e               O N
 2. Press the external LCD light button to display the battery status screen, and check
that:
The battery State is: Discharging / Charging
The SOE percentage is decreasing/ increasing. If SOE is below 10%, refer to
Additional StorEdge Troubleshooting on page 128.
The PWR value is greater than 0
B S N : X X X X X X X X I D : 2 4
S O E : 8 9 %           P W R : 3 W
T o t a l : < x > W h
S t a t e :   D i s c h a r g i n g
 3. Turn the AC back ON from the main distribution panel. The inverter should
reconnect loads back to the grid.
To test the Maximize Self-consumption mode:
 1. Verify the inverter ON/OFF switch is ON.
 2. Turn on as many loads so that consumption is greater than the inverter's maximum
AC power.
 3. Press the inverter LCD light button to display the Meter status screen and check that
import power is greater than zero:
StorEdge Solution with Backup MAN-01-00262-1.5
w
3 7 1 . 9 2 3 4 9 . 3
Chapter 10: System Configuration
    121

Advertisement

Table of Contents
loading

Table of Contents