  Upgrading the Inverter Firmware Version
The inverter has been activated using the activation card supplied with the
inverter
The inverter ON/OFF switch is OFF
The AC voltage to the inverter is OFF
 2. Remove the inverter cover.
 3. Make sure the RS485 Plug-in kit is installed in the inverter. This is indicated on the
inverter label.
 4. Insert the card into the communication board slot marked "CARD".
 5. Power on the battery, as explained in Powering the LG Chem Battery Off and On on
page 147. Wait 1 minute before proceeding.
 6. Turn ON AC to the inverter.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the
inverter cover is removed.
AVERTISSEMENT!
RISQUE D'ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le
couvercle de l'onduleur est retiré.
 7. The upgrade starts automatically. Wait for the message Done to be displayed on the
LCD.
 8. Remove the card from the inverter.
 9. Enter the inverter Setup mode: Press the internal Enter button for 5-10 seconds and
release. Enter the password 12312312.
1Ph/3Ph inverters                    
Figure 43: Inserting the upgrade card
StorEdge Solution with Backup MAN-01-00262-1.5
 