SolarEdge StorEdge Solution with Backup Installation Manual page 108

Table of Contents

Advertisement

of the communication board.
 10. Terminate the first and last SolarEdge device in the chain by switching a termination
DIP-switch inside the inverter to ON (move the left switch up). The switch is located
on the communication board and is marked SW7.
NOTE
Only the first and last SolarEdge devices in the chain should be terminated.
The other inverters in the chain should have the termination switch OFF
(down position).
StorEdge Solution with Backup MAN-01-00262-1.5
Chapter 9: Setting Up Communication to the Monitoring Platform
Figure 42: RS485 termination switch
    107

Advertisement

Table of Contents
loading

Table of Contents