Download Print this page

Cub Crafters CC11-160 Service Instruction

Hide thumbs Also See for CC11-160:

Advertisement

Quick Links

SERVICE INSTRUCTION
EFFECTIVE DATE:
SUBJECT:
MODELS AFFECTED:
COMPLIANCE TIME:
CONTINUED INSPECTION:
PURPOSE:
PARTS LIST:
Form #: EN-551
This Service Instruction is effective August 9th, 2012.
Over - Under Voltage Sensor Installation.
CC11-160 S/N 00093 through 00192.
It is highly recommended that this SI is installed at the next
maintenance event.
Recommended operational check of under voltage indication at every
annual.
The purpose of this SI is to provide.instructions for the installation of an
over-under voltage sensor which will allow the pilot to monitor the
electrical system of the aircraft more effectively.
PART
SP55012-001
Overvolt - Undervolt Sensor
SC56080-001
Radio Frequency Filter Assembly
SC71055-003
Warning LED Assembly
AN742D12
Tube Clamp
AN936-A6
Lock Washer #6
AN526C832R6
Screw, 8-32 x 3/8
AN526C832R8
Screw, 8-32 x 1/2
AN960-8L
Washer, Flat, Thin
AN364-832A
Nut, Nylon Lock
MS25171-1S
Boot, Electrical 90°
SC-A10A20O
CB To LV Module (Wire with Labels)
SC-A10B20O
LV Module to Ground (Wire with Labels)
SC-A10C20O
LV Module to Volt Light (Wire with Labels)
SC-A10D20O
Volt Light to Ground (Wire with Labels)
VP6001-001
Terminal Ring, 22-18G #6 Stud
VP6001-035
Terminal Ring, 22-18G #10 Stud
VP6001-039
Terminal Ring, 22-18G #8 Stud
VP6007-005
Solder Sleeve (Ø.105)
RM1070-001
Friction Tape, Electrical
SI0024 Rev NC
Page 1 of 8
DESCRIPTION
QTY
1
1
1
1
3
1
1
2
2
1
56"
50"
35"
35"
4
1
1
2
3"
03-02-2010

Advertisement

loading

Summary of Contents for Cub Crafters CC11-160

  • Page 1 This Service Instruction is effective August 9th, 2012. SUBJECT: Over - Under Voltage Sensor Installation. MODELS AFFECTED: CC11-160 S/N 00093 through 00192. COMPLIANCE TIME: It is highly recommended that this SI is installed at the next maintenance event. CONTINUED INSPECTION: Recommended operational check of under voltage indication at every annual.
  • Page 2: Installation Instructions

    SERVICE INSTRUCTION SI0024 Rev NC Page 2 of 8 INSTALLATION INSTRUCTIONS: 1. Gain access and disconnect Main Battery a. Unpin and slide pilot seat fully forward b. Tip pilot seat up and forward c. Disconnect main battery. Form #: EN-551 03-02-2010...
  • Page 3 SERVICE INSTRUCTION SI0024 Rev NC Page 3 of 8 2. Remove right forward interior access panel. 3. Drill sensor mounting hole in ignition module mounting bracket, refer to Figure 1. a. Size: Ø0.180 - Ø0.1875 (between #15 and 3/16). Form #: EN-551 03-02-2010...
  • Page 4 SERVICE INSTRUCTION SI0024 Rev NC Page 4 of 8 b. 4.4 inches (approx 4 3/8") from aft edge. c. Vertically centered in the flange. FIGURE 1: Looking Outboard Form #: EN-551 03-02-2010...
  • Page 5 SERVICE INSTRUCTION SI0024 Rev NC Page 5 of 8 4. Suggestion: tape a piece of paper to the inside of the boot cowl that will redirect any dropped hardware inside onto the floor and keep it from sliding down the inside of the boot cowl where access is difficult.
  • Page 6 SERVICE INSTRUCTION SI0024 Rev NC Page 6 of 8 d. "GND" post, i. Remove and discard 2 flat washers, retain nut. ii. Install other end of Radio Frequency Filter Assembly. iii. Install A10B20O. iv. Install lock washer. v. Reinstall nut. 6.
  • Page 7 SERVICE INSTRUCTION SI0024 Rev NC Page 7 of 8 8. Replace panel mounted warning LED, a. Cut, cap, and stow old wires connecting to warning LED. b. Remove currently installed warning LED from instrument panel. c. Install supplied warning LED, SC71055-003, in same place. 9.
  • Page 8 17. Recommended operational check of under voltage indication at every annual. MAJOR REPAIR AND ALTERATION (MRA): Installation of this service instruction is a major alteration per ASTM F2483 Section 9 and therefore an MRA form must be issued by Cub Crafters Inc. for installation in a given aircraft.