SolarEdge StorEdge Installation Manual page 52

Three phase inverter with setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

51
  Viewing System Status
Battery Status
This screen is displayed only when the battery is configured, and shows the battery
identification information, its charging status and power, and the operating mode.
Communication
Connected
State
Discharging
 
Communication: Connection to the inverter
Type: Battery type
SOE: State of Energy - the battery capacity percentage (calculated as Available
Energy\Max. Energy)
Power: The charging or discharging power (in Watts) according to the battery state
(see below)
State: The battery status: Charging/ Discharging, Idle, Init (pre-heating) or Fault
<error code>.
Charge/ Discharge Profile Programming Status
This screen is displayed only if Charge/ Discharge Profile Programming [Time-of-Use
(TOU)]  is configured, and shows information about the TOU settings for the site.
Name: The TOU profile file name
Last Sync: Date when the time-of-use profile was loaded from the monitoring
platform
Source: the source from which the TOU profile was uploaded:
Remote - Profile uploaded from the SolarEdge monitoring platform
Local - Profile uploaded from an SD card
Set Until: The date until the current profiles applicable
Battery
StorEdge SN
Type
LGC RESU 10
Power
280W
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
SOE
72 %

Advertisement

Table of Contents
loading

Table of Contents