43
  Configuring Communication with the Battery
 5. Set the Energy Meter's CT Rating according to the CT specifications.
 6. Select Meter 1 è Meter Function è Export+Import (E+I).

Configuring Communication with the Battery

 1. Make sure the battery's circuit breaker switch is ON.
 2. Switch the inverter ON/OFF/P switch to OFF.
 3. Access SetApp and select CommissioningèCommunication.
 4. Tap CAN.
 5. On the Batteries screen that opens, select your battery type from the list.

Running a Battery Self-test

Run a battery self-test to check the battery's charge and discharge functionality.
To run a battery self-test:
 1. Make sure the battery's circuit breaker switch is ON.
 2. Switch the inverter ON/OFF/P switch to ON.
 3. In SetApp, select Commissioning è Maintenance è Diagnostics è Self-Test è
Battery Self-Test è Run Test.
 4. Wait for all tests to complete and check the results in the summary table.
If any of the tests have failed, see the table below for possible solutions:
Test Results
Charge failed
Discharge failed
Communication
Inverter switch is off
To show the last test results:
Select Commissioning è Maintenance è Diagnostics è Self-Test è Battery Self-
Test è Show Last Results.
Check that the power and communication cables
between the battery and inverter are properly
connected.
Check that the power and communication cables
between the battery and inverter are properly
connected.
Check that the communication cables between the
battery and inverter are properly connected.
Switch the inverter ON/OFF/P switch to ON.
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
Solution