Step 3: Verifying Proper Activation And Commissioning; Configuring Communication With The Energy Meter - SolarEdge StorEdge Installation Manual

Three phase inverter with setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Information
From the Commissioning menu, select Information to view and set various system
settings, as described below.
CPU Version: The communication board firmware version
DSP 1/2 Version: The digital board firmware version
NOTE
Please have these numbers ready when you contact SolarEdge Support.
Serial Number: The inverter serial number as appears on the enclosure sticker
Error Log: Displays the last five errors, and enables resetting (clearing) the log
Warning Log: Displays the last five warnings, and enables resetting (clearing) the
log
Step 3: Verifying Proper Activation and
Commissioning
 1. Select Information and verify that the correct firmware versions are installed on each
inverter.
 2. Select Status and verify that inverter is operating and producing power (see also
Viewing System Status on page 44).
 3. Verify that the number of paired optimizers is the same as the number of physically
installed power optimizers.
 4. Verify that additional configurations were properly set by viewing the relevant
Status screens.
 5. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.

Configuring Communication with the Energy Meter

 1. Switch the inverter ON/OFF/P switch to OFF.
 2. Access SetApp and select CommissioningèCommunication.
 3. From the Communication screen, select RS485-1 è Protocol è Modbus (Multi-
Device).
 4. In the RS485-1 screen, select Add Modbus Device è Meter.
The meter is automatically identified.
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
Chapter 6: Activating, Commissioning and Configuring the System