SolarEdge StorEdge Installation Manual page 41

Three phase inverter with setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a high
voltage and the power optimizers no longer output a safe 1V output.
When the inverter starts converting power after the initial connection to the AC, the
inverter enters Wakeup mode until its working voltage is reached. This mode is
indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
 4. Tap OK to return to the main menu.
Communication
Communication settings can be configured only after communication connections are
complete. Refer to Setting Up Communication to the Monitoring Platform on page 52.
 1. Select the Communication menu to define and configure the following:
The communication option used by the inverter to communicate with the
monitoring platform.
The communication option used to communicate between multiple SolarEdge
devices or other external non-SolarEdge devices, such as electricity meters or
loggers.
 2. Tap the Server red arrow to set the communication method to be used for
communication between devices and the SolarEdge monitoring platform. The
default is LAN.
NOTE
The Server menu shows only the communication options installed in the
inverter.
For detailed information about all the configuration options, refer to the
Communication Options Application Note , available on the SolarEdge
website at
https://www.solaredge.com/sites/default/files/solaredge-
communication_options_application_note_v2_250_and_above.pdf.
Power Control
The Grid Control option may be disabled. Enabling it opens additional options in the
menu.
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
Chapter 6: Activating, Commissioning and Configuring the System
    40