  Step 2: Commissioning and Configuring the Installation
If not already ON - turn ON AC to the inverter by turning ON the circuit breaker
on the main distribution panel.
Open SetApp and follow the on-screen instructions (scan the inverter bar-
code, move the ON/OFF/P switch to P position for 2 seconds and release).
The mobile device creates a Wi-Fi connection with the inverter and displays the
main Commissioning screen.
In the main menus, tap the menu red arrows (
or configuration task. Tap the Back arrow (
The next sections provide more information about configuration options (in addition to
Country and Language and Pairing, described in Step 2: Commissioning and
Configuring the Installation on page 38).
Setting Country and Language
 1. From the Commissioning screen select Country and Language .
 2. From the Country drop-down list, select the required country setting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that
it complies with the country grid code and functions properly with the
country grids.
 3. From the Language drop-down list, select the language.
 4. Tap Set Language.
Pairing
Once all connections are made, all the power optimizers must be logically paired to
their inverter. The poweroptimizers do not start producing power until they are paired.
This step describes how to assign each inverter to the poweroptimizers from which it
will produce power.
Perform this step when the modules are exposed to sunlight. If the string length is
changed or a power optimizer is replaced, repeat the pairing process.
 1. From the main menu, select Pairing.
 2. Tap Start Pairing.
 3. When Pairing Complete is displayed, the system startup process begins:
Since the inverter is ON, the power optimizers start producing power and the
inverter starts converting AC.
) to return to the previous menu.
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
) to perform the system commissioning

Advertisement

Table of Contents
loading

Table of Contents