SolarEdge StorEdge Installation Manual page 37

Three phase inverter with setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Two right DIP switches - Switch to ON.
Left DIP switch (PIN 2 - PIN 6) - Selects a grounding PIN for the CAN bus
connector. Set according to battery manufacturer's instructions.
Connecting the Grounding Cable
Connect the grounding cable from the battery to the grounding hole on the side of
the inverter, as shown below. Use an M6 screw.
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
Figure 19: DIP switch set-up on the CAN board
Figure 20: Grounding the battery
Chapter 5: Connecting the Inverter