2. Open Communication Gland 2 and insert the other end of the communication cable
through the gland.
3. Remove the 3-pin connector from the RS485-1 port on the communication board
and loosen its screws.
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
Chapter 5: Connecting the Inverter
Figure 15: Meter Connection
32