  Chapter 5: Connecting the Inverter

Chapter 5: Connecting the Inverter

This chapter explains how to connect the inverter to:
AC grid
DC strings of modules with power optimizers
Energy Meter
Battery
Connecting the AC Grid
Use a five-wire cable. The maximum wire size for the input terminal blocks is 4 mm².
 1. Turn OFF the AC circuit breaker.
 2. Unscrew the ten Allen screws holding the inverter cover and remove the cover.
CAUTION!
When removing the cover, make sure not to damage internal components.
SolarEdge will not be held responsible for any components damaged as a
result of incautious cover removal.
 3. Strip 60 mm / 2.4'' of the external cable insulation and strip 8 mm / 0.32'' of the
internal wire insulation.
Figure 12: Insulation Stripping – AC Cable