SolarEdge StorEdge Installation Manual page 22

Three phase inverter with setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

ON (1) - Turning this switch ON (after optimizer pairing) starts the operation of
the power optimizers, enables power production and allows the inverter to
begin exporting power to the utility grid.
OFF (0) - Turning this switch OFF reduces the power optimizer voltage to a low
safety voltage and inhibits exportation of power. When this switch is OFF, the
control circuitry remains powered up.
P - Moving and releasing the switch allows viewing system information via the
LEDs, and performing the following functions:
P Position
Duration
Switch moved
to P for 2
seconds, then
released.
Switch moved
to P for more
than 5 seconds,
then released.
LEDs
LEDs: three LEDs indicate, by color and state (on/ off/ blinking
(2)
flickering
/alternating
performance indications.
(1) Blinking = Turns ON and OFF for the same duration
(2) Flickering = Turns ON for 100 mS and turns OFF for 5 seconds
(3) Alternating = alternate LED flashes
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1
Function
Displays (via
LEDs) production
information for 5 seconds,
or error type indications (if
exist) for 5 seconds.
Activates the Wi-Fi access
point for connecting to the
SetApp
Starts pairing
(3)
), different system information, such as errors or
Chapter 3: Installing the Inverter
Comments
While the switch is in P, all
LEDs are ON.
When the switch is released
all LEDs turn OFF for 0.5 sec
and then display the
production or error indication.
Pairing is indicated by all 3
LEDs blinking simultaneously.
(1)
/
    21

Advertisement

Table of Contents
loading

Table of Contents