Wiring Diagram For Practical Connection - Immergas ARES PRO 150 Instructions And Recommendations

High condensate water storage generator
Table of Contents

Advertisement

Inspections and maintenance
4.4
WIRING DIAGRAM FOR
PRACTICAL CONNECTION
VM
( ) A
ST1
3
1
2
F-(*)=
ARES PRO
150/230/300 CE: F-4A
ARES PRO
400/500
/600
CE: F-6,3A
BL
Y/G
BR
M1
SUPP.
ALIM.
230 V - 50 Hz
230 V - 50 Hz
Y1
A2
1
3
A2
1
BL
2
BR
Key:
A1.....A9
- Services connectors
E. ACC. 1-2
- Ignition electrode 1-2
E. RIL.
- Detection electrode
HSCP
- Temperature control
M1
- Boiler supply terminal board
SR
- Central heating temperature sensor
M2
- Safety Terminal Board
PF
- Flue pressure switch
PF min
- Minimum flue pressure switch
PG min
- Minimum gas pressure switch
PG max
- Maximum gas pressure switch
Y2
Y3
A1
A3
A4
A1
2
4
HSCP
2
1
3
A4
1
2
A2
3
4
4
3
A3
2
1
1
2
3
4
Y/G
L1
BR
N
BL
SL
- Condensate level sensor
T. ACC 1-2
- Ignition Transformation 1-2
TL
- Limit thermostat
VG
- Gas valve
VM (A)
- Modulating fan power supply
VM (R)
- Modulating fan adjustment/Det.
SE
- External probe connection clamps
FL
- Flow switch
INAIL
- Safety devices
TA
- Room thermostat
S.temp ACC
- Storage tank temperature sensor
44
VM
(R)
ST2
1
2
3 4 5
A3
A1
4
3
6
5
4
2
1
3
2
1
4
3
4
3
6
5
4
8
2
1
2
1
3
2
1
A2
A3
A1
Sw1
F1
A5
ROD1 ROD
1
2
TEFLON WH
E.RIL.
A5
1
2
SR
12
1
A4
6
12
11
1
7
6
5
4
3
2
1
Y1
6
5
4
A4
A6
1
2
3
1
1
A7
A8
2
4 5 6
5
A7
1
2
3
4 5 6
BR
BL
Y/G

Advertisement

Table of Contents
loading

Table of Contents